Services

Grouped by who has to approve it.

Most of the difficulty in this work is not technical, it is knowing which authority governs what you are trying to do. Three bodies cover almost everything below.

The six core services

Three authorities, six services.

A site often needs more than one of these. They are separate applications to separate offices, and doing them in the wrong order costs time.

CGWA

Central Ground
Water Authority

Permission to extract groundwater, and proof you are staying within it

CGWA governs extraction in notified areas. It wants hydrogeological evidence before approval and metered reporting afterwards, so the survey, the application and the meter belong to one continuous obligation.

BMC
MGSDA

Municipal &
state groundwater

Permission to put a hole in the ground

A different question from whether you may draw water. BMC grants permission to dig within municipal limits; MGSDA licenses groundwater development under Maharashtra regulation. A site may need these and a CGWA NOC.

MCGM

Greater Mumbai
municipal supply

Piped supply from the mains

Nothing to do with groundwater, and no CGWA NOC involved. Properties often pursue this alongside a bore so the two together cover demand.

Also handled

Other approvals we file.

Adjacent consultancy work, mostly for clients already engaging us on groundwater. These do not have pages of their own yet — ask and we will tell you what is involved.

Aviation NOC

Airport Authority of India approval for construction near airports, assessed against aerodrome zoning regulations.

Fire NOC

Fire Department approval against National Building Code fire-safety standards.

Solid Waste Management NOC

Municipal approval covering waste segregation, collection, processing and disposal.

Assessment tax consultancy

Property tax assessment verification, objection filing, and record updates.

Water audit & monitoring

Water-usage audits and groundwater monitoring reports, generally for CGWA compliance.

Environmental impact assessment

EIA reports for projects requiring environmental clearance.

How a CGWA NOC gets issued

Five stages, in order.

This sequence applies to the CGWA services above. Borewell permission and water connection follow their own authorities’ routes.

  1. 01

    Pre-application guidance

    Feasibility check before you spend anything. If the site cannot clear, you hear it here.

  2. 02

    Document preparation

    Hydrogeological study, site records, and the full CGWA document set assembled.

  3. 03

    Application submission

    Filed online and lodged with the CGWA regional office handling your district.

  4. 04

    Follow-up & approval

    We answer queries and clarifications from the authority until the NOC is issued.

  5. 05

    Post-NOC support

    Renewals, compliance reporting, and the telemetry readings CGWA expects.

Not sure which of these you need?

Describe the site and what you are trying to do. We will tell you which approvals it actually requires, and in what order.