Metering

Digital water flow meter with telemetry.

Real-time water-usage monitoring, required for CGWA compliance. The meter is how the authority knows you are drawing what your NOC says you are drawing.

Reading to report Telemetry path
FROM BORE Flow meter Telemetry DAILY LOG 08 Aug 412 m³ 09 Aug 388 m³ Recorded CGWA compliance report Permitted 450 m³/day Drawn 400 m³/day THE METER IS HOW THE AUTHORITY KNOWS YOU ARE WITHIN YOUR PERMITTED DRAW

Figures shown are illustrative. What matters is the path: a reading that is measured and transmitted, not estimated at renewal time.

Who approves it

CGWA compliance reporting

An extraction NOC is granted against a permitted volume, and CGWA expects that volume to be measured and reported rather than estimated. Telemetry is what turns a meter reading into a compliance record.

This is the part of the obligation that continues after approval, which is why it belongs with renewals rather than with installation work.

What you get

Everything included in this service.

Meter features

  • High-accuracy measurement technology
  • Digital display and data recording
  • Wide range of flow rate measurement

Telemetry benefits

  • Remote data transmission
  • Real-time monitoring via web or mobile
  • Automated alerts and notifications
  • Leak detection
  • CGWA compliance reporting

Where this sits

The stages this service covers.

Metering is a post-NOC obligation. It starts once the approval is in hand.

  1. 05

    Post-NOC support

    Renewals, compliance reporting, and the telemetry readings CGWA expects.

Where we have done this

On the register.

Named clients from the twelve approvals secured in 2025.

Usually goes with

What tends to come with it.

Metering follows an approval, and often sits alongside a municipal connection.

Due a compliance reading?

Tell us what your NOC permits and how you currently measure it, and we will tell you what is missing.