Connection

Water connection for properties.

Water connections for residential and commercial properties through the Municipal Corporation of Greater Mumbai. Application to installation, including the parts that stall.

Main to property MCGM sequence
STAGES, IN ORDER 01 Application to MCGM 02 Document verification 03 Site inspection USUALLY WAITS HERE 04 Fee processing 05 Connection installed PROPERTY Water meter MCGM main FERRULE TAPPING

Municipal supply, not groundwater — no CGWA NOC involved. Document verification and the inspection are the two stages worth chasing.

Who approves it

Municipal Corporation of Greater Mumbai

MCGM controls piped supply within Greater Mumbai. A connection application turns on document verification, fee processing, and a site inspection - and it is usually the inspection stage where applications sit.

This is municipal supply, not groundwater. It involves no CGWA NOC, though properties often pursue both so that borewell draw and piped supply together cover demand.

What you get

Everything included in this service.

  • Application submission to MCGM
  • Document preparation and verification
  • Fee payment processing
  • Inspection coordination
  • Approval follow-up
  • Connection installation support

Where we have done this

On the register.

Named clients from the twelve approvals secured in 2025.

Usually goes with

What tends to come with it.

Where a property draws from both mains and a bore, the groundwater side still needs its own approval.

Waiting on a connection?

Tell us the property and where the application has reached, and we will tell you what it needs next.